Ranchi Power Upgrade: JBVNL Prepares for Summer with Enhanced Infrastructure and ABCs
JBVNL is proactively strengthening Ranchi's power distribution network to prevent summer disruptions. Works include converting exposed wires to aerial bunched cables, installing and augmenting transformers, and repairing 11,000 kV lines. These measures aim to improve power supply quality and resilience against weather damage.
Comment / Reply From
You May Also Like
Popular Posts
Newsletter
Subscribe to our mailing list to get the new updates!